Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. Barrier Landscape Edging & Paver Edging 6'/8. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. The finish surface must be roughened by brushing to expose rocks. @>|0fWp^,Y/T!*gprE."8hjjJ7kUfmYxTsX"CfU2TL]Gdb_Kg,GA/`U)H!hkJARD[R` Obtain initial samples and have them tested for the specified attributes. construction contract standards page. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. BMP040 "rock slope protection (no fabric)" as applicable. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. Class 2 is the default Class for M288 applications. Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. endobj /OPM 1 Lap 6'' min. When specified, ensure coloring is added to the concrete. xZrFou D[&! For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. /Type/ExtGState Review Section 4-90, Concrete, of this manual for details about concrete production. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. Click on the to send the number to the <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. If the slope is steeper than 2:1, do not use rounded boulders and cobbles. For details about concrete production, review Section 4-90, Concrete, of this manual. TAR_%R5Wa%*x4ux-x5d1c
iU:v9b!KXGcFK 1fN2 t K! uuid:30dd8676-a64b-4579-9ccf-fc82965d356f Rock mesh slope protection is a technique to control rockfalls . Your search for great running gear starts and ends with us. { , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. (see Riprap Slope Protection Worksheet). Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. <> <> More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! (For large riprap, consider a four inch layer of sand to protect the . Ensure the timber spacers are of the required material and spaced as planned. If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. Click on the product name for a data sheet. Obtain rock samples for acceptance tests. Review contractors verification of unit weight of rock-filled gabions. The contract will identify the designated method. Start by choosing whether your patio is a **single rectangle** or if it has a different shape, in which case you. 0000008331 00000 n
Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. Ensure that rocks of the specified sizes and shapes are being used. All rights reserved. You may check the size of rock by roughly measuring the size and converting the volume to mass. endobj 5 0 obj Source: Caltran Highway Design Manual, Chapter 870 JavaScript is required to use content on this page. endobj US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. There are three material gradation requirements based on required rock layer thicknesses. L Earth Compacted Fabric Engineering 6'' 1'-0'' centers Staples at 6'' 2'' 6'' (Rock Splash Basin) TYPE 4 1 2 (Rock Slope Protection) TYPE 5 Staples at 12 inch centers. endobj <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> trailer
<<
/Size 489
/Info 438 0 R
/Root 464 0 R
/Prev 989742
/ID[<23d8c9b814a334ef8bf252da6b923edc><23d8c9b814a334ef8bf252da6b923edc>]
>>
startxref
0
%%EOF
464 0 obj
<<
/Pages 445 0 R
/Type /Catalog
>>
endobj
487 0 obj
<< /S 1440 /Filter /FlateDecode /Length 488 0 R >>
stream
2019-07-30T13:44:04-04:00 Use the size and composition of yarn that is recommended by the fabric manufacturer. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Polypropylene is stable within a pH range of 2 to 13. To compensate for the lack of flexibility in the completed structure, ensure an adequate foundation lies below this type of protection. Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. Technical Support available for assistance. 0000002021 00000 n
Fabric must be RSP fabric that complies with the class shown in the following table: Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. endobj <>stream %PDF-1.4
%
The plans indicate the minimum depths of foundations. 4 0 obj 0000005658 00000 n
<< The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0
0=F5VvL(^f 4-7203C Small-Rock Slope Protection The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. FDM 10-10-3 Decide whether modifications are necessary as a result of changed conditions. 0000002336 00000 n
Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.
How To Unmark An Invoice As Paid In Quickbooks,
Ncl Butler And Concierge Service,
Benefits Of Diversity And Inclusion For You Personally,
Nick Saban Daughter Wedding,
Articles R